| Q.82 | Sequentially arrange the following steps which are involved in surveying to build an irrigation structure. A.Reconnaissance survey B.Preliminary survey C.Examine the water availability D.Final location survey E.Final survey report | |
| Ans | 1. A, B, D, E, C | |
| 2. A, B, C, D, E | ||
| 3. C, A, B, D, E | ||
| 4. C, A, B, E, D |
Correct Ans: 3