Q.58 In production planning and control, routing refers to the:Ans 1. progress of work performed2. balancing of load on machines3. authorisation of work to be performed4. sequence of operations to be performedCorrect Ans Provided: 4
RankiQ Discuss Latest Questions
Q.45 Which of the following is NOT an objective of total productive maintenance?Ans 1. Produce goods without increasing product quality2. Reduce maintenance3. Scheduled maintenance4. Supply quality goods to the customerCorrect Ans Provided: 1
Q.64 Gear tooth vernier is used to measure:Ans 1. circular pitch2. tooth thickness at pitch line3. dedendum4. addendumCorrect Ans Provided: 2
Q.60 In a vapour compression cycle, the phase of refrigerant at exit of expansion valve is:Ans 1. wet vapour2. saturated liquid3. sub-cooled liquid4. dry vapourCorrect Ans Provided: 1
Q.62 Which of the following two parameters are NOT sufficient to specify the state of a wet vapour?Ans 1. Temperature and dryness fraction2. Pressure and dryness fraction3. Pressure and temperature4. Pressure and volumeCorrect Ans Provided: 3
Q.44 Consider the following statements. 1. Thread pitch gauge is used to determine pitch of a thread. 2. Thread pitch gauge is a precision measuring instrument. 3. Pitch is the distance between two conjugative threads. ...
Q.65 Inventory carrying cost includes which of the following?Ans 1. Cost of follow up2. Obsolescence and depreciation cost3. Cost of transportation4. Inspection costCorrect Ans Provided: 2
Q.52 Modulus of casting is defined as the ratio of:Ans 1. surface area of casting to volume of casting2. volume of casting to surface area of casting3. surface area of riser to volume of casting4. volume of casting ...
Q.63Ans 1.2.3.4.Correct Ans Provided: 1
Q.43 Which of the following commands is used to make a square? Ans 1. SQA2. RE3. REC4. SQARCorrect Ans Provided: 3