Q.25 Expected time of PERT activity is given by: [A = Optimistic time, B = Pessimistic time, C = Most likely time]Ans 1. (A + 4C + B)2. (A + 4B + C)/63. (A + 4C + B)/64. (A ...
RankiQ Discuss Latest Questions
Q.16 “A smallest circle which is tangent to the cam profile and drawn from the center of rotation of a radial cam” is known as:Ans 1. Stroke2. Pitch curve3. Prime circle4. Base circleCorrect Ans: 4
Q.50 Which of the following is CORRECT?Ans 1. CAPP stands for “Computer Aided Present Planning “2. CAPP stands for “Control Aided Process Planning3. CAPP stands for “Control And Process Planning”4. CAPP stands for “Computer Aided Process Planning”Correct Ans: ...
Q.49 The full form of EST in PERT/CPM technique is:Ans 1. Earliest Stop Time2. Event Start Time3. Event Stop Time4. Earliest Start TimeCorrect Ans: 4
Q.10 A spur gear has module of 3 mm and pitch line velocity of 3.14 m/s. The number of teeth on gear is 30. What will be the speed of gear (in rpm)?Ans 1. 555.7 rpm2. 333.7 rpm3. ...
Q.3 Atomic packing factor for BCC (Body Centered Cubic) structure is:Ans 1. 0.82. 0.743. 0.684. 0.52Correct Ans: 3
Q.37 “ICG” stands for:Ans 1. Intelligent Computer Graphics2. Interactive Computer Graphics3. Interactive Control Graphics4. Intelligent Control GraphicsCorrect Ans: 2
Q.11 If total variance along a critical path is 0.81. What will be the standard deviation of critical path?Ans 1. 0.032. 0.33. 0.654. 0.9Correct Ans: 4
Q.17 Which of the following is NOT the type of annealing?Ans 1. Flame annealing2. Full annealing3. Process annealing4. Spheroidise annealingCorrect Ans: 1
Q.26 Which of the following is NOT the benefit of GT (Group Technology)?Ans 1. It reduces planning cost2. It increases work- in-process3. It reduces setting time4. It reduces material handling timeCorrect Ans: 2